Skip to content
All projects

Industrial

Lyka Laboratories

Ankleshwar

Water supply and drainage for the SVP-II plant and storm water design for the entire site.

Lyka Laboratories, Ankleshwar
Location
Ankleshwar
Status
Ongoing — 2025
Area
7.5 acres
Consulting Engineers
M/s. Ami Engineers
Sector
Industrial

Key features

  • Upgradation of existing water network
  • Meander-type septic tank with bio-bed
  • Bio-swale
  • Storm water channel
Lyka Laboratories — project image

Work with us

Planning something similar?

Share your drawings or a short brief. We usually respond within one working day with a scope and the right engineer for the job.